Mediterranean Sea wind farm first lined up

Published

German wind turbine manufacturer Senvion has been appointed by Beleolico as the supplier for Taranto wind farm.

Taranto will be the first offshore plant in the Mediterranean Sea, according to Senvion, with a total rated power of 30 MW from 10 Senvion turbines, each with a hub height of 100m.

The turbines will be in front of Taranto harbor in the Apulia region (Southern Italy), in 4-18m water depth. Delivery and installation of the turbines is currently planned in summer 2018, while their commissioning is expected to take place in autumn 2018.

Jointly with the turbines supply and installation, the agreement signed by Beleolico and Senvion foresees a 25-year full maintenance service contract for the Taranto wind farm.

Current News

QatarEnergy Receives Offshore Exploration License From Libya

QatarEnergy Receives Offshore

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

Libya Awards First Oil Blocks

TGS Embarks on Multi-Client 2D Survey off Angola

TGS Embarks on Multi-Client 2D

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Orbital Marine Grows UK and Ca

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine