Offshore Europe News - page 561

 

North Sea mega-Mariner jacket installed - video

Sep 01, 2015

Statoil’s largest ever steel jacket has been laid to rest on the sea bed 150km east of the Shetland Isles, marking a major milestone in the Mariner heavy oil field development.  The 22,400-tonne mariner jacket, which stands some 134m high…

Faroe snaps up Blane and Enoch stakes

Sep 01, 2015

Faroe Petroleum has agreed to buy UK explorer Roc Oil GB, including its 12.5006% stake in the North Sea Blane field and a 12% interest in the Enoch field, also in the North Sea for up to US$20 million. Roc Oil GB is a subsidiary of Roc Oil Company…

Pile testing to the limits

Sep 01, 2015

DONG Energy and ESG have just completed what they have described as the largest testing of wind turbine piles completed. DONG Energy and ESG tested 28 piles on two different onshore sites in order to assist the development of new design methods for offshore wind farms…

Subsea 7 wins Culzean gig

Sep 01, 2015

Subsea 7 has been awarded a subsea, umbilical, riser and flowline (SURF) contract by Maersk Oil worth more than US$150 million for the Culzean development. The ultra-high-pressure, high-temperature field, one of the largest gas discoveries offshore UK…

Focusing on efficiency

Sep 01, 2015

High oil prices in a mature basin led to a tight market and cost escalation. With low oil prices, the industry is working hard to rein in spending. Elaine Maslin spoke to Oil & Gas UK CEO Deirdre Michie on some of the initiatives underway…

Factory drilling

Sep 01, 2015

Drilling on Statoil’s Mariner will be a mega project – but Statoil is looking to lighten the load in ways that could only be done on such a large project. Elaine Maslin found out more. The Mariner field concept artists’ illustration…

Robotic intervention

Sep 01, 2015

Offshore workers could soon find themselves sharing their facilities with robots, particularly in remote, harsh or hazardous environments. Elaine Maslin looks at the Argos Challenge. Homologation phase with the FOXIRIS robot…

Making waves

Sep 01, 2015

Assumptions around tidal arrays need to be rethought, according to Professor Stephen Salter. Emma Gordon reports. Image from iStock. The renewables industry needs to contest the…

Making it simple

Sep 01, 2015

Hurricane Energy has proven commercial oil can flow from its fractured basement oil reservoirs West of Shetland – it’s next job is finding an economical solution to get it to market. Elaine Maslin reports. Artist's…

FPS market expected to rise

Sep 01, 2015

Spending on floating production systems is expected to increase 73% in 2015-2019, with US$81 billion due to be spent over that period. Douglas Westwood analyst Ben Wilby sets the scene. BG Group’s Knarr FPSO…

Designer mud

Sep 01, 2015

Designer mud is helping Total tap pressure depleted HPHT reservoirs in the UK North Sea. Elaine Maslin takes a look. The West Franklin well head platform installation last year.  Photos from Total…

Forty and still ‘a beaut’

Sep 01, 2015

For OE, 2015 is a milestone year – it’s our 40th anniversary. We share that milestone with one of the world’s most iconic oil fields – the UK North Sea Forties field. Elaine Maslin charts the field’s history and finds out what the future holds…

Doubling Dutch wind capacity

Sep 01, 2015

The Gemini wind park in the Dutch sector of the North Sea has broken financing and renewables project size records. Elaine Maslin takes a look. An artists’ illustration of the Gemini wind park offshore Netherlands…

Fast fabrication

Sep 01, 2015

Meg Chesshyre talks to Heerema Fabrication Group CEO Koos-Jan van Brouwershaven about the firm’s latest projects. Cygnus PU sail away. Photos from Heerema Fabrication Group.  Heerema…

Rising to TCP demands

Sep 01, 2015

Airborne Oil & Gas is taking a staircase approach to introducing new thermoplastic composite pipe (TCP) technology to the oil and gas industry, with TCP risers in its sights. Elaine Maslin reports. A 6in TCP flowline…

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine