Oselvar I-spool

Published

Serimax recently fabricated, field joint coated and hydrotested an 85m pipe-in-pipe I-spool on behalf of Technip for Dong Energy’s Oselvar field in the Norwegian North Sea. The I-spool comprises a 10in Super Duplex pipe, insulated along its length, in a 14in carbon steel pipe externally coated with three-layer polypropylene. The workscope also included fabrication of the five outrigger sea-fastening structures required to support the I-spool on the installation vessel.

The project was carried out at a quayside fabrication facility recently set up by Serimax at Cromarty Forth Port Authority’s Invergordon base in the north of Scotland.

Current News

QatarEnergy Receives Offshore Exploration License From Libya

QatarEnergy Receives Offshore

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

Libya Awards First Oil Blocks

TGS Embarks on Multi-Client 2D Survey off Angola

TGS Embarks on Multi-Client 2D

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Orbital Marine Grows UK and Ca

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine