VIDEO: 10,000-tonne Mariner topside lift

The first of eight topside modules, which will make up Statoil's Mariner platform, have been installed offshore Shetland in the UK North Sea.

The 10,000-tonne Mariner A utility module was lifted into place by the Saipem 7000 as planned. Now, seven more modules and a flare are being installed. 

Mariner is one of the largest projects currently under development on the UK Continental Shelf. 

Mariner is on the East Shetland Platform of the UK North Sea, about 150km east of the Shetland Isles. The heavy oil field has an estimated 250 MMbo with an average plateau production expected at about 55,000 b/d.

Image: Saipem 7000 lifting the Mariner utility module photo credit Jamie Baikie Signal2Noise Statoil

Read moreMariner ready for offshore lift, field could hold more

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine