VIDEO: 10,000-tonne Mariner topside lift

Published

The first of eight topside modules, which will make up Statoil's Mariner platform, have been installed offshore Shetland in the UK North Sea.

The 10,000-tonne Mariner A utility module was lifted into place by the Saipem 7000 as planned. Now, seven more modules and a flare are being installed. 

Mariner is one of the largest projects currently under development on the UK Continental Shelf. 

Mariner is on the East Shetland Platform of the UK North Sea, about 150km east of the Shetland Isles. The heavy oil field has an estimated 250 MMbo with an average plateau production expected at about 55,000 b/d.

Image: Saipem 7000 lifting the Mariner utility module photo credit Jamie Baikie Signal2Noise Statoil

Read moreMariner ready for offshore lift, field could hold more

Current News

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Eco Wave Power Wraps Up Feasib

OneSubsea Gets Gullfaks Subsea Compression Upgrade by Equinor

OneSubsea Gets Gullfaks Subsea

Saipem Agrees $272M Deal to Acquire Deep Value Driller Drillship

Saipem Agrees $272M Deal to Ac

New Alliance Targets Offshore Caisson Integrity Challenges

New Alliance Targets Offshore

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine