Keppel delivers FPSO to MODEC in Brazil

Published

Keppel Offshore & Marine's BrasFELS shipyard in Brazil has delivered the Cidade de Campos dos Goytacazes MV29 floating production storage and offloading (FPSO) vessel to MODEC.

The FPSO was completed safely, on time and within budget, and departed the shipyard recently for Bananal Bay in Brazil. It will then be deployed in the Tartaruga Verde and Tartaruga Mestiça fields in the Campos Basin, off the coast of Rio de Janeiro.

It is BrasFELS' fifth collaboration with MODEC and BrasFELS' 9th FPSO project for Brazil.

BrasFELS' workscope for the Cidade de Campos dos Goytacazes MV29 included the fabrication of nine topside production modules as well as integration works. The FPSO has a production capacity of 150,000 b/d and 5 MMcm/d of natural gas, and a storage capacity of 1.6 MMbo.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine