Boskalis in Thien Ung topside installation

Published

In this video, Royal Boskalis Westminister show the topside installation for the Vietsovpetro Thien Ung project, offshore Vietnam.

Boskalis installed the Thien Ung BK-TNG 4200m topside and 850m living quarter by offshore heavy lifting with the sheerleg Asian Hercules III heavy lift vessel.  

The topside and living quarters were installed on a (preinstalled) jacket in the Nam Con Son Basin, at a water depth of 120m. The topside lift, which is the heaviest offshore lift by a sheerleg was successfully completed on 21 September 2016 and the living quarters on 24 September 2016, Boskalis said.

The Thien Ung gas field is in Block 04-3 in Nam Con Son basin. The project aims at exploiting natural gas deposits at Thien Ung. In addition, the project will implement a system to remove CO2 gas from the natural gas stream while compressing gases from the Dai Hung 2 wellhead platform at Block 05-1A. 

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine