Enauta Starts Anchoring Campaign for FPSO Atlanta

Published

Mooring line - Credit: Enauta
Mooring line - Credit: Enauta

Brazilian oil and gas company Enauta, the operator of the Atlanta field in Santos Basin. offshore Brazil, has started the anchoring campaign for the FPSO Atlanta, which is expected to start production in 2024.

This marks the start of installation works on what is called Atlanta’s Phase I, which will bring a larger capacity FPSO to the field that has so far been producing oil via the Petrojarl I FPSO.

"[The anchoring ] stage consists of installing flexible riser anchors and torpedo anchors for the new [FPSO]. The campaign follows the original project schedule," Enauta said.

The FPSO Atlanta will be supplied by Malaysia's Yinson Production and deployed at Enauta's Atlanta field, with oil production set to start in mid-2024 with six production wells.

FPSO Atlanta will have the capacity to process 50,000 barrels of oil and 140,000 barrels of water per day, and to stock 1.6 million barrels of oil.

Enauta normally produces oil from the Atlanta field offshore Brazil using the early production system, the Petrojarl I FPSO. The Petrojarl I FPSO has a production capacity of 30,000 barrels of oil per day and a storage capacity of 180,000.

Torpedo anchor - Credit: Enauta

Current News

Petrobras Signs $521m Contracts for Gas Carriers, Barges and Pushers

Petrobras Signs $521m Contract

Blackstone Considers $5b Sale of Beacon Offshore Energy

Blackstone Considers $5b Sale

Galp Focuses on Growing Upstream in Brazil, Namibia

Galp Focuses on Growing Upstre

Stena Drilling, Keystone Join Forces for Automation-Enabled Well Delivery

Stena Drilling, Keystone Join

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine