Siem Offshore's PSV to Feature Wärtsilä Energy-saving Hybrid Propulsion

Siem Pride - Credit: Wärtsilä
Siem Pride - Credit: Wärtsilä

Finland-based marine equipment and technology provider Wärtsilä will upgrade Siem Offshore's platform supply vessel ‘Siem Pride’ for hybrid engine and battery propulsion. 

The upgrade will enable the vessel to reduce the number of engines in use during operations and lower its energy and fuel consumption.

"Central to the conversion will be the Wärtsilä HY Module, which is a containerized solution on the deck of the vessel," Wartsila said.

The energy management system acts as the overall brain for the system, and creates a high level of interaction with the ship’s other onboard systems. The installation will be connected to the existing 690-volt main switchboard. The engines in operation may run at up to 95 percent maximum continuous rating (MCR) without risk of overloading or blackouts, Wärtsilä said.

"Decarbonising our operations is central to our strategy going forward, which is why we have taken this important step to convert the ‘Siem Pride’ for hybrid propulsion. Wärtsilä has industry-leading experience and expertise in this field, and their upgrade solution will deliver considerable added value to the vessel’s performance,” says Jon August Houge, Operations Manager, Siem Offshore.

“We have worked closely with Siem Offshore for more than ten years, and are excited at this possibility to further reduce the carbon footprint of their fleet. When operating on electric power, there will be obvious savings in fuel costs and emissions. Furthermore, when in use, the ship’s engines may operate more on LNG, which further enhances the ship’s environmental sustainability,” says Steven Gavshon, General Manager, Projects and Operations, Wärtsilä Marine Power.

For the upgrade, Wärtsilä will supply the hybrid drive, the energy management system, the transformer, batteries, and the switchboard modification. The dynamic-positioning system will also be upgraded, while the ship design will be modified for the new arrangement. A deckhouse containing the equipment will also be installed. Finalization of the project is projected for April 2022, at which time the vessel will be awarded DNV’s Battery Power notation.

The vessel currently operates with two Wärtsilä 34DF and two Wärtsilä 20DF dual-fuel engines, as well as a complete Wärtsilä electrical package, including the integrated automation and power management systems, and the company’s Low Loss Concept power distribution system which features higher efficiency, lower weight and volume, and high system redundancy.

Current News

Did You Know? AI-Enhanced Botnets Become Ever Evasive

Did You Know? AI-Enhanced Botn

Enersol to Acquire Deep Well Services in $223M Deal

Enersol to Acquire Deep Well S

New Industry Alliance Targets Tech Supply for Multi-MW Tidal Energy Projects

New Industry Alliance Targets

Sweden Greenlights One, Rejects 13 Offshore Wind Farms

Sweden Greenlights One, Reject

Subscribe for OE Digital E‑News

Offshore Engineer Magazine