Energean Power FPSO Floated Out

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Current News

Navantia Seanergies Delivers Second Substation Jacket for French OW Farm

Navantia Seanergies Delivers S

Keyfield Ventures into Indonesia’s Oil and Gas Market with New Partner

Keyfield Ventures into Indones

EU: 44 Oil and Gas Firms Asked to Provide CO2 Storage Solutions

EU: 44 Oil and Gas Firms Asked

Norway Grants Permit for Equinor’s Drilling Plan in North Sea

Norway Grants Permit for Equin

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine