Energean Power FPSO Floated Out

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Current News

Synera and Dong Fang Offshore Sign 15-Year Offshore Wind SOV Deal

Synera and Dong Fang Offshore

Teledyne’s Division Launches eXtreamer for Marine Seismic Surveys

Teledyne’s Division Launches e

Shelf Drilling Nets First Dutch North Sea Job with Tenaz Energy

Shelf Drilling Nets First Dutc

Equinor Officially Opens Norway’s Northernmost Oil Field

Equinor Officially Opens Norwa

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine