Energean Power FPSO Floated Out

Published

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Current News

Chevron Vessel Begins Gas Survey Offshore Greece

Chevron Vessel Begins Gas Surv

ExxonMobil Greenlights $4B Kizomba Revamp with Fresh Discovery off Angola

ExxonMobil Greenlights $4B Kiz

Japan's KEPCO Joins 390MW Polish Offshore Wind Project

Japan's KEPCO Joins 390MW Poli

Türkiye Set for Offshore Seismic Surveys in Pakistan Ahead of 2027 Drilling

Türkiye Set for Offshore Seism

Subscribe for OE Digital E‑News