Energean Power FPSO Floated Out

September 23, 2019

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.



Current News

ONGC Inks Deal with ExxonMobil for Deepwater Exploration in India

ONGC Inks Deal with ExxonMobil for Deepwater Exploration in India

US Advances Plans for Offshore Wind in Maine

US Advances Plans for Offshore Wind in Maine

Pemex and Union Agree to 4% Salary Increase

Pemex and Union Agree to 4% Salary Increase

Navigating a Minefield: Why UXO Could Hamper the UK’s Offshore Wind Ambitions

Navigating a Minefield: Why UXO Could Hamper the UK’s Offshore Wind Ambitions

Subscribe for OE Digital E‑News

Offshore Engineer Magazine