Energean Power FPSO Floated Out

September 23, 2019

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.



Current News

SLPE to Design Foundations for Inch Cape Offshore Wind Farm

SLPE to Design Foundations for Inch Cape Offshore Wind Farm

RWE Signs Deals to Expand Lease Areas of Four Offshore Wind Farms in UK

RWE Signs Deals to Expand Lease Areas of Four Offshore Wind Farms in UK

Wintershall Noordzee Wraps Sillimanite Drilling. Calls for Dutch Gov't to Boost E&P Sector

Wintershall Noordzee Wraps Sillimanite Drilling. Calls for Dutch Gov't to Boost E&P Sector

OPITO Ventures into Renewables

OPITO Ventures into Renewables

Subscribe for OE Digital E‑News

Offshore Engineer Magazine