New semi delivered to Mexico’s Grupo R

Published

La-Muralla-semiThe newbuild semisubmersible La Muralla IV arrived in Mexico waters after a 16,200-mile journey.

Fairmount Marine’s tug Fairmount Glacier delivered the semisubmersible La Muralla IV to the Bay of Campeche, Mexico. The rig was towed from Okpo, South Korea, via the Sunda Strait and Cape of Good Hope.

La Muralla IV is a new semisubmersible drilling rig for ultra deep water operations, owned by Mexican Grupo R. The rig was constructed by Deawoo Shipbuilding & Marine Engineering in South Korea and is designed to drill up to depths of 10,000m. The rig has a length of 118.6m and a width of 96.7m.

The tug hooked-up with the rig at the end of October 2012 at the port of Okpo, South Korea. The convoy sailed south then west via southeast Asia’s Sunda Strait and around Africa’s Cape of Good Hope toward the Gulf of Mexico. The convoy arrived in Mexican waters at the end of February after covering more than 16,200 miles at an average speed of 6.6 knots.

Current News

Santos Divests Non-Core Gas Assets to Eni and Comet Ridge

Santos Divests Non-Core Gas As

Vår Energi Starts Up Another North Sea Project

Vår Energi Starts Up Another N

Poland’s First Offshore Wind Auction as Test for Stalled European Market

Poland’s First Offshore Wind A

Trump Targets Venezuelan Oil Exports with ‘Sanctioned’ Tankers Blockade

Trump Targets Venezuelan Oil E

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine