Lishui 36-1 gas field begins production

Published

Hong Kong-based CNOOC Ltd. announced the Lishui 36-1 gas field began production.

The Lishui 36-1 gas field is located 150km from Wenzhou city Zhejiang province, with an average water depth of approximately 84m.

The gas field has four producing wells, and its primary production facilities include a comprehensive platform and a processing terminal.

CNOOC Ltd. is the operator with 51% interest along with partners Primeline Energy China Ltd. (36.75% ) and Primeline Petroleum Corp (12.25%).

Read more:

South China Sea oil find

 

 

 

 

Current News

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Jasmund Substation’s Topside and Jacket Sets Sail to Baltic Sea

Jasmund Substation’s Topside a

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine