PetroJunín achieves first oil

Published

PetroJunín, a joint venture formed between PDVSA (60%) and Eni (40%), achieved first oil from the Junín-5 heavy oil field, located in the Faja del Orinoco, off Venezuela. The block is located around 550 km southeast of Caracas and covers an area of approximately 425 sq km. The Junín-5 block holds 35 billion boe of certified oil in place. PDVSA and Eni plan to increase production to approximately 15,000 b/d by the end of 2013. The partnership intends to achieve 75,000 b/d by early 2015, through the drilling of approximately 180 wells.

Current News

2025: Fascinated with Subsea Discovery

2025: Fascinated with Subsea D

Petrobras strike-hit P-40 Platform shut down after gas leak: union

Petrobras strike-hit P-40 Plat

Aker BP Extends Scarabeo 8 Contract for Offshore Drilling in Norway into 2028

Aker BP Extends Scarabeo 8 Con

Poland Allocates 3.4 GW Capacity in Offshore Wind Auction

Poland Allocates 3.4 GW Capaci

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine