Van Oord wins Shell Gabon EPC contract

Published

Shell Gabon awarded Van Oord an engineering, procurement and construction (EPC) contract for the replacement of a dual 10km long oil export line.

The EPC contract began this month and continues until summer 2015.

The export line runs from the Gamba terminal, 200 NM south of Port of Gentil, to a pipeline end manifold (PLEM). The existing 30 in. line will be replaced by a looped dual 22 in. sea line system with pigging facilities allowing for inspection and cleaning. Van Oord will deploy shallow water pipe lay barge Stingray.

Last month, Shell made a large exploration discovery at the Leopard-1 well, offshore Gabon. The exploration well encountered a substantial gas column with around 200m net gas pay in a pre-salt reservoir.

In September, Ulstein won the design and equipment contract for Van Oord’s new subsea rock installation (SRI) vessel Bravenes.

Read more:

Shell in Gabon discovery

Ulstein to design Van Oord SRI vessel

Current News

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Jasmund Substation’s Topside and Jacket Sets Sail to Baltic Sea

Jasmund Substation’s Topside a

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine