Amec Foster Wheeler gets US$73.9 million BP work

Published

BP awarded Amec Foster Wheeler a US$73.9 million, five-year contract to provide operations, maintenance and project support for the Forties Pipeline System (which includes the Unity offshore platform and onshore pumping stations in Aberdeenshire and Perthshire) and the Central Area Transmission System terminal in Teesside, northeast England.

The contract will run until January 2020 and will be managed from Amec Foster Wheeler’s Aberdeen offices. The contract secures 90 jobs, including two apprenticeships (currently based at the CATS terminal).

Image from Amec Foster Wheeler.

Current News

Turkey Launches Deep Sea Drilling Mission in Somalia

Turkey Launches Deep Sea Drill

OMV Nominates BP Executive Emma Delaney as Next CEO

OMV Nominates BP Executive Emm

Petrobras Buys Back Petronas Stake in Two Brazil Offshore Fields

Petrobras Buys Back Petronas S

OneSubsea to Supply Production Boosting System for Shenandoah Field

OneSubsea to Supply Production

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine