Trelleborg opens seal inspection facility

Published

Trelleborg Sealing Solutions has opened a dedicated climate-controlled swivel stack seal inspection facility for the validation of custom seals for floating production storage and offloading (FPSO) operators.

The facility, located in Barendrecht, in the Netherlands, provides a temperature-controlled environment to avoid fluctuations in the dimensions of the seals caused by temperature changes, with specialist storage racks allowing the seals to be acclimatized prior to inspection.

In addition, a custom inspection table has been installed, on which seals up to 3000mm can be measured with special lighting to aid visual inspection.

Furthermore, Trelleborg’s FPSO focus group, who are based on site, is made up of a team of experts trained to inspect the specialist seals.

Image: Seal validation facility/ Ripple Effect Communications 

Current News

India's ONGC Set to Retain 20% stake in Russia's Sakhalin-1 Project

India's ONGC Set to Retain 20%

NEO NEXT+ Rises as UK’s Largest Independent O&G Producer Under New Merger

NEO NEXT+ Rises as UK’s Larges

Harbour Energy to Sell Stakes in Indonesian Assets to Prime Group for $215M

Harbour Energy to Sell Stakes

U.S. Oil Production Still has Growth Potential

U.S. Oil Production Still has

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine