Frames finishes Petrobras FPSO work

Published

Frames Flow Control & Safeguarding has completed the flow control and safeguarding equipment for the Petrobras FPSO Cidade de Campos dos Goytacazes MV29.

Modec Offshore Production Systems (Singapore), a Modec group company, awarded Frames a contract for supplying one subsea hydraulic power unit (HPU) package, 14 production well control racks, eight water injection well control racks, and accessory equipment for the Petrobras FPSO Cidade de Campos dos Goytacazes MV29. The Frames equipment is expected to be delivered this month. 

The FPSO Cidade de Campos dos Goytacazes MV29 will be used to develop the Tartaruga Verde and Tartaruga Mestiça fields, located in the Campos basin off the coast of Brazil. The FPSO will be capable of processing 150,000 b/d.

The Frames flow control and safeguarding equipment is designed to provide a clean and reliable hydraulic pressurized fluid for the actuators of hydraulic operated subsea valves, the company said.

“The production of FPSOs is becoming increasingly challenging, especially in today’s difficult economic climate,” Kor Paap, Frames account manager for subsea hydraulics said. “For us, but also for oil companies and contractors, it’s necessary to work efficiently and reduce costs. With our technical know-how and multidisciplinary capabilities for design optimization, we were able to provide the most customized cost-effective solution for this project.”

Current News

Gastech 2026 to convene global energy leaders in Bangkok as Asia accelerates demand, LNG investment and system transformation

Norway Offshore Workers, Employers Avert Strike By Entering Mediation

Norway Offshore Workers, Emplo

ADNOC’s XRG Expands Stake in Rio Grande LNG Project in Texas

ADNOC’s XRG Expands Stake in R

Vattenfall Installs First Monopile on Germany's Largest Offshore Wind Farm

Vattenfall Installs First Mono

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine