Production halted, power lost at Goliat FPSO

Published

Production was brought to a halt at the Goliat FPSO on Friday (26 August) evening after power was lost, Eni Norge said.

The Goliat FPSO, from Eni.

In accordance with standard procedure, the decision was made to send non essential personnel to shore.

The non essential personnel was sent to Hammerfest by helicopter where they were received by Eni Norge representatives.

When the power returned a few hours later, the evacuation was stopped, and the situation normalized.

Eni Norge has notified all relevant authorities.

In March, production finally started from Norway’s first Arctic oil field, at the Goliat floating production facility in the Barents Sea. 

The 180 MMbo field, the first producing oil field in the Barents Sea and the northernmost producing oilfield, will produce 100,000 b/d once all 22 of its subsea wells (12 production and seven water and gas injection wells) are on stream. Currently, 17 wells have been completed.

Read more:

Goliat finally achieves first oil

Current News

Turkish Drill Ship Heads to Somalia for First Overseas Mission

Turkish Drill Ship Heads to So

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine