Vroon VOS Start to use Barge Master gangway

Published

Vroon’s walk-to-work vessel VOS Start will be equipped with the brand-new Barge Master Gangway, which will enable safe and efficient transfer of personnel and cargo, the company said.

Image of the VOS Start, from Vroon.

The Barge Master Gangway incorporates an access tower with elevator, providing stepless access. The adjustable pedestal provides full flexibility in landing heights. This next-generation walk-to-work vessel will be available to the offshore industry in Q2 2017.

“During the development of the gangway we worked closely together with Vroon,” says Martijn Koppert, CEO of Barge Master. “We developed a total logistics solution for efficient installation and maintenance of offshore platforms and wind turbines. The small footprint, its light weight and the modular design with hoisting, elevator and many other options have led to this next-generation gangway. The end product is a fit-for-purpose gangway system that can be purchased or hired at a very competitive price. We are convinced that this is the gangway clients are looking for nowadays.”

”Our next-generation walk-to-work vessel VOS Start will offer a very high standard of onboard hotel experience for up to 60 client personnel, plus a state-of-the-art walk-to-work configuration, supported by Barge Master,” says Jan-Piet Baars, Vroon group director offshore.

Current News

DeepOcean Awarded IMR Contract Extension by Equinor

DeepOcean Awarded IMR Contract

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

BOEM Initiates Process for Pot

Jumbo Scoops Two Offshore Wind Contracts

Jumbo Scoops Two Offshore Wind

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

Wood Nets Long-Term Maintenanc

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine