GMC wins two caisson fabrications contracts

Published

GMC was awarded two further caisson fabrications contracts from North Sea operators, following its recent and first caisson installation in the North Sea earlier this year.

Image of the GMC SWL Caisson, from GMC.

Both contracts are from the North Sea operators will utilize GMC’s multi-tooth connector, specifically designed for replacement caisson applications.

GMC will provide the full offshore installation package including all tools, hydraulic power packs, and skilled personnel for these two awards. Mobilization is expected during Q1 2017.

GMC says its offshore handling and installation method: eliminates offshore caisson welding; provides operators with a safe and efficient fabrication and installation methodology; reduces the installation time to a minimum; provides operators with a very cost effective solution over conventional installation methods; and delivers considerable overall cost savings, while at the same time, extending the life of aging assets.

Current News

MFE Inspection Solutions Launches Offshore Division

MFE Inspection Solutions Launc

Seatrium and Aibel Seek Arbitration to Resolve DolWin 5 Disputes

Seatrium and Aibel Seek Arbitr

Viridien, SLB Set to Launch ‘Massive’ OBN Survey Offshore Egypt

Viridien, SLB Set to Launch ‘M

TGS Starts Multi-Client Data Reprocessing Scheme off Australia

TGS Starts Multi-Client Data R

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine