Wood Group gets Echidna work

April 7, 2017

Wood Group was awarded a multi-year contract from Karoon Petróleo & Gás to provide owner’s engineering services to support the full field development for the Echidna field offshore Brazil marking the first project between the two companies. The contract will be executed by Wood Group’s Rio de Janeiro office focusing on the technical requirements of a floating production unit (FPU) and subsea structures, and all bid package evaluations and execution phase. The equipped FPU will be located in the Echidna field within the Santos Basin and moored in a maximum water depth of 400m.

“Our ability to deliver local world-class design capabilities with a range of available tools and software made Wood Group a partner of choice for the field development project,"saidHugues Corrignan, managing director of Wood Group Brazil’s office. “Wood Group’s competitive bid, provided an excellent opportunity for both companies to establish a mutually rewarding partnership for current and future developments.”

Read more:

Premier awards topside O&M contract to Wood Group

Wood Group wins Mad Dog 2 work

Karoon hits at third Santos well

Karoon confirms Echidna oil



Current News

Var Energi Resumes Drilling Offshore Norway Citing Positive Effect of Tax Breaks

Var Energi Resumes Drilling Offshore Norway Citing Positive Effect of Tax Breaks

Shell CEO: No V-Shaped Recovery After COVID-19

Shell CEO: No V-Shaped Recovery After COVID-19

Westwood Expects 40 FPSOs to be Ordered in 2020-2024 Period

Westwood Expects 40 FPSOs to be Ordered in 2020-2024 Period

What's Behind Rising Tensions in the South China Sea?

What's Behind Rising Tensions in the South China Sea?

Subscribe for OE Digital E‑News

Offshore Engineer Magazine