Wood Group gets Echidna work

Published

Wood Group was awarded a multi-year contract from Karoon Petróleo & Gás to provide owner’s engineering services to support the full field development for the Echidna field offshore Brazil marking the first project between the two companies. The contract will be executed by Wood Group’s Rio de Janeiro office focusing on the technical requirements of a floating production unit (FPU) and subsea structures, and all bid package evaluations and execution phase. The equipped FPU will be located in the Echidna field within the Santos Basin and moored in a maximum water depth of 400m.

“Our ability to deliver local world-class design capabilities with a range of available tools and software made Wood Group a partner of choice for the field development project,"saidHugues Corrignan, managing director of Wood Group Brazil’s office. “Wood Group’s competitive bid, provided an excellent opportunity for both companies to establish a mutually rewarding partnership for current and future developments.”

Read more:

Premier awards topside O&M contract to Wood Group

Wood Group wins Mad Dog 2 work

Karoon hits at third Santos well

Karoon confirms Echidna oil

Current News

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Jasmund Substation’s Topside and Jacket Sets Sail to Baltic Sea

Jasmund Substation’s Topside a

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine