Statoil to remove Norne emergency response vessel

Published

Statoil has received consent from Norway’s Petroleum Safety Authority (PSA) to change the emergency response vessel solution for the Norne field in the Norwegian Sea.

Norne is an oil and gas field in the Norwegian Sea, around 80km north of Heidrun. The field has been developed using a floating production storage and offloading (FPSO) unit tied to seven well templates.

To date, Norne has had its own emergency response vessel. In connection with a change to area response for Halten Nordland, Statoil has applied for consent to remove this vessel.

The area response for Halten Nordland is now covered by two vessels.

Current News

Shell Greenlights Waterflood Project to Bolster Production in Gulf of America

Shell Greenlights Waterflood P

ESVAGT Acquires Two SOVs from Edda Wind

ESVAGT Acquires Two SOVs from

Dräger to Supply Gas Detection, Monitoring Tech to North Sea Operator

Dräger to Supply Gas Detection

NKT Expands Swedish Cable Accessories Plant Amid Rising Demand

NKT Expands Swedish Cable Acce

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine