European Energy Erects Zinkgruvan First Turbine at Zinkgruvan

The first turbine has been erected at European Energy's Zinkgruvan wind project in Sweden marking an important milestone in the offshore wind sector.

The project is located approximately 70 km north of Linköping, near the northern end of the Vättern Lake. The Zinkgruvan project will have a capacity of 53.2 MW when completed and will supply approximately 40.000 Swedish households with fossil-free energy.

Thorvald Spanggaard, Project Director at European Energy, said:  “GE Renewables has worked very well on the project and so have our other contractors. That has allowed us to pass the milestone of erecting the first turbine within time and budget. Now we have to use the positive momentum for the erection of the next 13 turbines and the commissioning phase.”

The wind farm will consist of 14 GE Renewables turbines with a capacity of 3.8 MW and a rotor size of 137 meters and a hub height of 110 meters.

Current News

Decarbonization Offshore O&G: Navigating the Path Forward

Decarbonization Offshore O&G:

US Offshore Wind: Outlook Strong Despite Construction Productivity Issues

US Offshore Wind: Outlook Stro

Bourbon Orders Exail Tech to Streamline Subsea Fleet’s Services for Offshore Energy

Bourbon Orders Exail Tech to S

Asso.subsea Wraps Up Subsea Cables Installation at French Floating Wind Pilot

Asso.subsea Wraps Up Subsea Ca

Subscribe for OE Digital E‑News

Offshore Engineer Magazine