Huisman Building Drilling System for CMHI

Published

Photo: Huisman Equipment BV
Photo: Huisman Equipment BV

This week, China Merchants Heavy Industries (CMHI) awarded Huisman a contract for the engineering and fabrication of a drilling system which will be integrated and installed on the moored drilling semi-submersible constructed at CMHI Haimen.

This drilling system will be used for oil and gas drilling activities in shallow to medium water depths all around Asia, particularly the South China Sea.

The contract is a result of a constructive cooperation between CMHI and Huisman during the semi’s concept design. The drilling system comprises an 1800kips static rated load Dual Multi Purpose Drilling Tower (DMPT), a single pipe setback drum,  innovative manipulator arms for pipe and tool handling, top drive, iron roughnecks, skid carts, catwalk machines, gantry and deck cranes, drillers cabins and Huisman’s fully integrated control system.

The Dual Multi Purpose Tower (DMPT) will be delivered in the second quarter of 2020 to CMHI Jiangsu Yard in China. Fabrication and final commissioning of the completed DMPT will take place at Huisman China.

Current News

Transocean Secures $184M for Drilling Rigs Operating off Norway

Transocean Secures $184M for D

HydroWing Wins 10MW CfD Boost for Morlais Tidal Energy Project

HydroWing Wins 10MW CfD Boost

UK Grants Consent for 1.5GW Outer Dowsing Offshore Wind Farm

UK Grants Consent for 1.5GW Ou

Harbour Seals $3.2B LLOG Acquisition Deal and Enters US Gulf of America

Harbour Seals $3.2B LLOG Acqui

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine