Petrobras Test Well at Mero Field Reached 58,000 BPD

FPSO Pioneiro De Libra (Photo: Teekay)
FPSO Pioneiro De Libra (Photo: Teekay)

Oil company Petróleo Brasileiro SA, or Petrobras, said on Wednesday it finished a long-term test at the Mero field in the Libra pre-salt area with positive results.

The Brazilian company said in a statement that the well used for the test in Mero reached an average production of 58,000 barrels per day, considered by the firm as very good taking into account the ultra-deep characteristics of the pre-salt reserve.


(Reporting by Marcelo Teixeira)

Current News

Decarbonization Offshore O&G: Navigating the Path Forward

Decarbonization Offshore O&G:

US Offshore Wind: Outlook Strong Despite Construction Productivity Issues

US Offshore Wind: Outlook Stro

Bourbon Orders Exail Tech to Streamline Subsea Fleet’s Services for Offshore Energy

Bourbon Orders Exail Tech to S

Asso.subsea Wraps Up Subsea Cables Installation at French Floating Wind Pilot

Asso.subsea Wraps Up Subsea Ca

Subscribe for OE Digital E‑News

Offshore Engineer Magazine