Statoil to use Scarabeo 5 at Njord

Published

Norway’s Petroleum Safety Authority (PSA) has granted Statoil consent to use the Scarabeo 5 semisubmersible rig for well activities on the Njord field, in the Norwegian Sea.

Statoil is the operator at Njord, around 130km north of Kristiansund.

The Njord field has been developed using a semisubmersible drilling, accommodation and production facility, Njord A, and the Njord B FSU. Water depth at the site is 330m. Production on the field began in 1997.

The PSA has now granted Statoil consent to use Scarabeo 5 for various well activities associated with production wells on the field. The activities are scheduled to begin on 10 November 2016. 

Image of the Scarabeo 5, from Saipem.

Current News

Eni Installs ‘World's First’ Purpose-Built Offshore CCS Platform

Eni Installs ‘World's First’ P

TotalEnergies Selects SLB for Global Digital Drilling Program

TotalEnergies Selects SLB for

TenneT Joins Subsea Cable Decommissioning Tool Development

TenneT Joins Subsea Cable Deco

Seatrium Signs FSRU Conversion Deal with Excelerate Energy

Seatrium Signs FSRU Conversion

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine