Quadrant to drill Driftwood-1 off Australia

Published

Quadrant Energy has decided to change its drilling plans in the Carnarvon Basin offshore Western Australia. 

The firm had proposed to drill the Palmerston-1 well. After a technical evaluations and engagement with the regulator, Quadrant now plans to drill the Driftwood-1 well, says partner on the license, WA-320-P, Tap Oil (9.778% participating interest). The well is a commitment well, due in WA-320-P by Q4 2016. 

The Driftwood-1 well has an expected total well cost of A$15.47 million (gross), which is substantially lower than the estimated cost for Palmerston-1 of A$98.2 million, says Tap Oil. 

Driftwood-1 is in WA-320-P in the Barrow sub-basin of the Northern Carnarvon Basin, offshore Western Australia, approximately 1km north of the Rosily-1A exploration well which had minor oil shows.

Quadrant Energy is due to use the Noble Tom Prosser jackup drilling rig, with operations starting 1 August.

The well objective is to test the Early Cretaceous sandstones of the Mardie Greensand Member, Birdrong Member and Zeepaard Formation in a low-relief, northeast-southwest trending four-way dip closure.

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Precision Shaft Alignment: A S

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Aquaterra Energy Gets Multi-Ye

Two DOF Vessels Get Work in North Sea and Australia

Two DOF Vessels Get Work in No

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Seatrium Unit Launches Arbitra

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine