Quadrant to drill Driftwood-1 off Australia

Published

Quadrant Energy has decided to change its drilling plans in the Carnarvon Basin offshore Western Australia. 

The firm had proposed to drill the Palmerston-1 well. After a technical evaluations and engagement with the regulator, Quadrant now plans to drill the Driftwood-1 well, says partner on the license, WA-320-P, Tap Oil (9.778% participating interest). The well is a commitment well, due in WA-320-P by Q4 2016. 

The Driftwood-1 well has an expected total well cost of A$15.47 million (gross), which is substantially lower than the estimated cost for Palmerston-1 of A$98.2 million, says Tap Oil. 

Driftwood-1 is in WA-320-P in the Barrow sub-basin of the Northern Carnarvon Basin, offshore Western Australia, approximately 1km north of the Rosily-1A exploration well which had minor oil shows.

Quadrant Energy is due to use the Noble Tom Prosser jackup drilling rig, with operations starting 1 August.

The well objective is to test the Early Cretaceous sandstones of the Mardie Greensand Member, Birdrong Member and Zeepaard Formation in a low-relief, northeast-southwest trending four-way dip closure.

Current News

Teledyne eXtreamer for Seismic Data Receives 2026 Spotlight on New Technology Award

Teledyne eXtreamer for Seismic

Iran War Reshapes Global LNG Trade

Iran War Reshapes Global LNG T

US Exempts Gulf of Mexico Drillers from Endangered Species Rules

US Exempts Gulf of Mexico Dril

Fugro to Conduct Site Investigation for South America’s First Offshore Wind Project

Fugro to Conduct Site Investig

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine