West Epsilon to P&A on Huldra

Published

The Petroleum Safety Authority (PSA) Norway has given Statoil consent to use the West Epsilon jackup drilling facility for permanent plugging of wells at Huldra 30/2-A, in production license 051.

Statoil has allocated 215 days for the activity, which will start in Q2 2016. Water depth at the site is 125m.

West Epsilon, a jackup rig, is operated by North Atlantic Drilling, formerly known as Seadrill Offshore and was issued an acknowledgement of compliance (AoC) by the PSA for West Epsilon on 14 February 2003.

Current News

Eni, Repsol to Invest $2b in PDVSA Joint Venture

Eni, Repsol to Invest $2b in P

IKM Testing's New Tech Speeds Up North Sea Decom Ops

IKM Testing's New Tech Speeds

Securing Remote Energy Sites: A Guide to Modern Access Control

Securing Remote Energy Sites:

Petronas Names ‘World's First’ Nearshore FLNG Facility

Petronas Names ‘World's First’

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine