Engineering and project management firm Atkins has own a pre-front end engineering and design decommissioning contract with Centrica Energy. The five-year agreement will see Atkins provide UK-based Centrica with engineering and design services…
Aibel was awarded a US$114.3 million engineering, procurement, construction and installation (EPCI) contract for work related to planned water injection from the Heidrun platform to the Wintershall Norge-operated Maria field. The Maria field is in the Norwegian Sea…
The Norwegian Petroleum Directorate (NPD) received a plan for development and operation (PDO) for the Maria oil discovery in the Norwegian Sea. Maria. Image from Wintershall. The Maria discovery…
Petroleum and energy minister Tord Lien opened the Valemon gas and condensate field in the North Sea on 16 April. Expected recoverable reserves from the field are 192 MMboe. Valemon ribbon cutting…
Statoil confirmed its second discovery in the Aasta Hansteen area with the Roald Rygg prospect in the Norwegian Sea. Map of Roald Rygg. From Statoil. The gas discovery was made at…
French supermajor Total is assessing development options for a new small gas discovery made in the Norwegian sector of the North Sea. The estimated 3-10 MMboe recoverable gas discovery was in exploration well 25/6-5 S, called Skirne East by Total and Shango by partner Faroe Petroleum…
Total has spudded exploration well 25/6-55, named Shango by partner Faroe Petroleum, in license 627 (Skirne East) in the Norwegian North Sea. Shango is on the northern part of the Utsira High about 5km from the producing Skirne field…
Statoil and Wood Group Mustang Norway (WGMN) completed the hook-up of the Valemon platform in the North Sea. Valemon. From Statoil. WGMN teamed with the Korean engineering, procurement…
Centrica has cut its exploration and budget 40% saying that it thinks oil prices will remain low for the rest of 2015 and potentially also into 2016 and 2017. The comments, made by the firm's CEO Iain Conn, echo BP CEO Bob Dudley's…
Wintershall Norge awarded DNV GL a US$3.95 million contract to be the sole supplier for the combined role of independent verification body (IVB) and third party design verification scope for the subsea, umbilicals, risers and flowlines (SURF) part of the Maria field development project…
Norway's Ministry of Petroleum has welcomed interest in its latest Awards in Pre-defined Areas licensing round, despite the expection that future discoveries in the area will be smaller than in the past. Stakes in some 54 new production…
Statoil shows the process of getting its US$2.9 billion Valemon field on stream. The high-pressure, high-temperature, gas and condensate development, located in the Norwegian sector of the North Sea, started production on 3 January…
The Statoil-operated, NOK 22.6 billion Valemon high-pressure, high-temperature, gas and condensate development in the Norwegian sector of the North Sea started first production yesterday (3 January). The Valemon field, containing an estimated 192 MMboe recoverable reserves…
Germany’s Wintershall increased the recoverable resources for its Norwegian Sea Maria field by 40MMboe. The Maria field. From Wintershall. The field is now expected to reach 180MMboe recoverable resources…
Centrica Resources Norge’s wildcat well 6707/10-3S is being permanently plugged and abandoned after making a minor gas discovery in the Norwegian Sea, according to the Norwegian Petroleum Dictorate (NPD). Map of PL 528 B…