Exxon Begins Uaru Production in Guyana

Monday, November 16, 2026

ExxonMobil said on Monday it had started production at its Uaru project in Guyana's offshore Stabroek block, bringing the South American country's installed oil production capacity to 1.1 million barrels per day.

Uaru is the fifth ExxonMobil-led development project to start production in the Stabroek block. The company is bringing projects using floating production, storage and offloading, or FPSO, vessels online in stages to expand Guyana's output capacity.

Here are more details:

  • The Errea Wittu FPSO vessel has an initial production capacity of 250,000 barrels per day

  • ExxonMobil said the vessel is expected to achieve its initial capacity in the first quarter of 2027

  • Errea Wittu has storage capacity of 2 million barrels and joins the Destiny, Unity, Prosperity and One Guyana FPSOs

  • Last week, the US energy major approved funding for the Longtail project, its eighth planned Stabroek development

  • ExxonMobil Guyana operates the Stabroek block with a 45% interest, while Chevron holds 30% through its 2025 acquisition of Hess, including Hess' Guyana assets

  • CNOOC Petroleum Guyana holds the remaining 25% interest in the Stabroek block

(Reuters)

Categories: Industry News Activity Production Guyana Oil Production

Related Stories

Port of Blyth Unveils $265M Offshore Wind Expansion Plan

Adura Starts Gas Production at $2.8B North Sea Gas Field

Harbour Energy Raises 2026 Outlook Again on Record Output

Current News

Eni to Reach Investment Decision on Mozambique FLNG Expansion by 2027

Exxon Begins Uaru Production in Guyana

DOF Group Awarded Field Support Vessel Contract in Africa

Lee Brandie Appointed as Interim Managing Director of Subsea Connect

Subscribe for OE Digital E‑News