Meet ZEUS, a Proposed Zero-emission Power Station

Tuesday, August 27, 2024

Aker Solutions, PETRONAS Carigali Sdn. Bhd., MISC Bhd and Clean Energy System Inc, signed a Memorandum of Understanding (MOU), effectively commencing the Zero Emission Power Station (ZEUS) pilot project, an energy solution that uses oxyfuel combustion with immediate CO2 capture and storage.

The ZEUS technology employs advanced oxyfuel combustion to convert high CO2 natural gas into dispatchable power while capturing 100% of the CO2 emissions. The CO2 is immediately injected into a reservoir for permanent storage or can be used to increase production of both oil and gas before being permanently stored.

The aim of ZEUS is the ability to handle the combustion at elevated pressures, enabling more compact and simplified process equipment, potentially leading to cost savings while enhancing CO2 management capabilities.

Another unique characteristic of oxyfuel combustion is that it can burn untreated gas straight from the well, including gas with up to 90% CO2. This opens the door for using gas reserves that would otherwise be considered uneconomic to develop.

Categories: Technology Energy People Industry News The Path to Zero Renewable Offshore Oil & gas

Related Stories

Oceaneering Wins Offshore Brazil Contract with Petrobras for ROV Services

Equinor Awards Over $600M in Contracts for Four Subsea Projects

Shell Enlists AGR for Workforce Resourcing off Norway

Current News

Vår Energi Gets Clearance to Drill Wildcat Well in Norwegian Sea

US Moves Forward with Delfin LNG Deepwater Port License

TGS Sells North American Well Data Business to Enverus

TRIG to Exit Batrice Offshore Wind Farm in $200M Stake Sale Deal

Subscribe for OE Digital E‑News