Enauta Restarts Production from Atlanta Field Offshore Brazil

Monday, June 26, 2023

Brazilian oil company Enauta has restarted production from the Atlanta field offshore Brazil, after the completion of the scheduled maintenance shutdown of the FPSO Petrojarl I.

The well production will gradually be restarted in accordance with the scope of the Early Production System of FPSO Petrojarl I, aiming to collect data and confirm the reservoir's potential for the development of production with FPSO Atlanta (Definitive System), scheduled for mid-2024.

 After confirming the high productivity potential of the wells and observing the reservoir's behavior over time, the Company will prioritize operational consistency and the extension of the lifespan of temporarily installed subsea equipment alongside FPSO Petrojarl I. 

Additionally, as previously notified at the end of May, Enauta identified the need to implement improvements in connectors of the pumping system, which required operational adjustments during the remaining period of FPSO Petrojarl I's activity. 

This includes rescheduling the production of well 7-ATL-2HP-RJS ("2HP") to the fourth quarter of 2023. 

 

Categories: Activity FPSO Production South America

Related Stories

Petrobras Picks TechnipFMC for Flexible Flowlines Delivery off Brazil

Framo Signs Record Pump Service Deal for Petrobras FPSO Fleet

Valaris Adds $220M to Offshore Drilling Backlog

Current News

Legasea Launches Subsea Basket Rental Program

Lamprell Picks IMI for Offshore Platforms and Jackets Fabrication

Eni Installs ‘World's First’ Purpose-Built Offshore CCS Platform

TotalEnergies Selects SLB for Global Digital Drilling Program

Subscribe for OE Digital E‑News