Shell Starts Production from 20,000 boe/d PowerNap Field in U.S. Gulf of Mexico

OE Staff
Tuesday, March 29, 2022
Credit: Shell - Copyright
Mike Duhon Productions

Shell has brought online its PowerNap project, a subsea development in the U.S. Gulf of Mexico with an expected production of 20,000 barrels of oil equivalent per day (boe/d). PowerNap is a tie-back to the Shell-operated Olympus tension leg platform (TLP) in the prolific Mars Corridor.

"Shell has been producing in the Mars Corridor for more than 25 years, and we continue to find ways to unlock even more value there,” said Zoe Yujnovich, Shell Upstream Director. “PowerNap strengthens a core Upstream position that is critical to achieving our Powering Progress strategy and ensuring we can supply the stable, secure energy resources the world needs today and in the future.”

Shell discovered PowerNap in 2014. The oil field is located in the south-central Mississippi Canyon area around 240 kilometres (~150 miles) from New Orleans in about 1,280 metres (~4,200 feet) of water.

Three production wells produce through a single insulated 19-mile flowline and high-pressure gas lift capability. Shell operates Olympus with a 71.5% working interest, with BP controlling the remaining 28.5%.

PowerNap production will be transported to market on the Mars pipeline, which is operated by Shell Pipeline Company LP and co-owned by Shell Midstream Partners, L.P. (71.5%) and BP Midstream Partners LP (28.5%).

Categories: Energy Deepwater Activity Production North America Gulf of Mexico

Related Stories

Mento Platform Off Trinidad and Tobago Produces First Gas

Mento Platform Off Trinidad and Tobago Produces First Gas

First Oil from Mero-4 FPSO in Brazil pre-salt

First Oil from Mero-4 FPSO in Brazil pre-salt

SLB Unveils Novel Imaging Tool to Optimize Drilling Efficiency

SLB Unveils Novel Imaging Tool to Optimize Drilling Efficiency

Current News

BP Lines Up Noble Rig for North Sea CCS Drilling Job

Eni Starts Drilling Activities off Ghana with Seventh-Gen Drillship

Gibdock Wraps Up Refurbishment of TechnipFMC's Deepwater Pipelayer

Portuguese Firm Bags $280M for Maintenance Work on Petrobras' Platforms

Subscribe for OE Digital E‑News

Offshore Engineer Magazine