Waterjet Propelled Workboat Delivered for work Offshore in the Gulf of Guinea

MarineLink
Wednesday, September 1, 2021

A 12m workboat built by Strategic Marine has completed sea trials and was delivered to Tullow Ghana Limited.

The vessel will be deployed to offshore deepwater projects in the Gulf of Guinea.To this end the vessel has been fitted with an advanced marine propulsion system, with waterjets designed to provide superior manoeuvrability.

The workboat is designed to be launched and retrieved from a larger mothership with a single point lifting hook and will primarily perform line handling and crew transfer duties. It features a 2 ton capstan, 5 ton tow hook and an open transom, allowing crew to perform the required line
handling duties with ease.  It can achieve a top speed of 25 knots fully loaded and carries up to 10 passengers.

Categories: Shipbuilding Offshore Vessels Workboat Waterjets

Related Stories

Trump Targets Venezuelan Oil Exports with ‘Sanctioned’ Tankers Blockade

Jan De Nul Wraps Up Cable Installation Job for TenneT’s DolWin Platform

Ocean Infinity Takes Delivery of Final Armada Fleet Vessel

Current News

2025: Fascinated with Subsea Discovery

Petrobras strike-hit P-40 Platform shut down after gas leak: union

Aker BP Extends Scarabeo 8 Contract for Offshore Drilling in Norway into 2028

Poland Allocates 3.4 GW Capacity in Offshore Wind Auction

Subscribe for OE Digital E‑News