Havyard Delivers Another Offshore Wind Service Vessel to Esvagt

OE Staff
Thursday, June 24, 2021

Norway-based Havyard Leirivik said Thursday it had handed over a new wind farm service vessel to the Danish shipowner Esvagt.

The vessel named ‘Alba’ is the second in a series of three vessels.

Havyard's Norwegian Electric Systems has delivered the bridge solution and automation and electric power systems on board. Norwegian Greentech has provided a system for the treatment of ballast water, while HAV Design has been responsible for the ship design.

The wind farm service vessel is the fifth such vessel built at Havyard Leirvik and the second in the HAV 831L SOV design series.

The third wind farm service vessel in the series is ready to be fitted out. The handover of this vessel will take place in autumn.

Service Operation Vessels (SOV) are seen as a cost-efficient solution when it comes to the maintenance of offshore wind farms located far from shore where frequent transportation of technicians from shore is not practical due to the distance.

 An SOV is deployed near a wind farm and serves as sort of a hotel/workshop where technicians then can spend weeks offshore, and "walk to work" via specialized gangways.

Categories: Offshore Vessels Industry News Offshore Wind Activity

Related Stories

Cadeler Wraps Up Turbine Installation Job at Poland’s First Offshore Wind Farm

Siemens Energy Picks EST-Floattech for Marco Polo's CSOV Battery System

IWS Places $300M Order for Four New Skywalker-Class CSOVs

Current News

Petrobras Picks TechnipFMC for Flexible Flowlines Delivery off Brazil

Framo Signs Record Pump Service Deal for Petrobras FPSO Fleet

Equinor Ups Snøhvit Future Cost Estimate to $2.8B, Timeline Unchanged

Yinson Production Raises $1.46B to Refinance Agogo FPSO

Subscribe for OE Digital E‑News