TECH: KENC Engineering Lifting Tool for Offshore Wind

MarineLink
Wednesday, November 18, 2020

Van Oord awarded Breman Machinery and KENC Engineering with the assignment to design and build a casing lifting adapter (CLA). The lifting tool supports the installation of 190 pin piles at Saint-Brieuc offshore wind farm.

The CLA can handle 275 tonnes and is designed to connect with the temporary casing used during drilling operations. It is equipped with redundant safety pin connections and can be operated remotely. The lifting tool includes a sub-sea IP camera to provide real-time images during fitting operations. In early February 2021 the CLA will be delivered to Van Oord.

Categories: Offshore Heavy Lift

Related Stories

Van Oord Names Next-Generation Fallpipe Vessel Pair

Fugro Nets Australian Subsea Asset Integrity Contract

Stillstrom Picks Semco for Offshore Charging Equipment

Current News

New Subsea Equipment Provider AQO Joins the Market

Omega Subsea to Deploy ROVs on NKT’s Cable Laying Vessels

SLB Secures Aramco Well Construction Work for 450 Wells

LD Armateurs Adds Multi-Purpose Vessel to its Fleet

Subscribe for OE Digital E‑News