Keppel Wins Yinson FPSO Modification Work

Tuesday, July 16, 2019

Singapore-based Keppel Offshore & Marine (Keppel O&M) has through its wholly-owned subsidiary Keppel Shipyard, secured a contract from repeat customer Yinson for the modification of a floating production, storage and offloading vessel (FPSO).

The contract is between Keppel Shipyard and Yinson Nepeta Production Ltd, a wholly-owned subsidiary of Yinson Production Pte Ltd, for the fast-track modification and upgrading of FPSO Allan. Keppel Shipyard’s scope of work includes refurbishment and life extension works, fabrication and installation of a new riser balcony, spread mooring system and helideck, as well as modification of the vessel’s topsides and marine systems.

The project is scheduled to commence in the third quarter of 2019 with delivery expected in the first quarter of 2020. Upon completion, the FPSO will have a storage capacity of 700,000 barrels of oil and a processing capacity of 60,000 barrels of oil per day. It will be deployed in the Anyala and Madu fields, offshore Nigeria for First Exploration and Petroleum Development Co Ltd.

Eirik Barclay, CEO of Yinson Offshore Production, said, "We have chosen to partner with Keppel Shipyard for this fast-track upgrade project just as the market is showing a positive trend with an increasing number of both project awards and tenders.”
 

Categories: Contracts Offshore Vessels Engineering Industry News FPSO Floating Production

Related Stories

Another Piece of the Puzzle

Tullow Makes Second Discovery Offshore Guyana

Digital Twin: Taking Shape of the Offshore Ecosystem

Remote Technologies Augment Capabilities

ExxonMobil Reports Discovery Offshore Guyana

OFS Sector Expected to Take a Hit

ClampOn: Ultrasonic Intelligent Sensors

Chevron to Boost St. Malo Production

Utgard Comes on Stream

P-68 FPSO Ready for Deployment

Current News

Australia Reviewing Equinor Environmental Plan

Equinor, SSE Win Contract for Largest Offshore Wind Project

Liberator Pilot Well Plugged and Abandoned

Petrofac Sells Mexico Assets to Perenco

Petronas Q2 Profit Rises 8%

Allseas Scores Gyda Platform Removal Job

Monitoring, and Addressing, Crude Quality in Real-time

Dominion to Build Largest US Offshore Wind Farm

Maersk Drilling Rig Extended by Equinor

IUMI Reports Cut in Offshore Insurance Premiums

Subscribe for OE Digital E‑News

OE Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week