Troll C production shutdown

Press Release
Monday, November 19, 2012

Production on the Troll C platform in the North Sea has been temporarily halted pending further investigation of corrosion found in the auxiliary system for gas treatment, Statoil announced on 15 November 2012.

During a scheduled inspection on the platform corrosion was discovered on a tank in the glycol system, which is an auxiliary system for treating gas on the platform.

A similar tank in a parallel gas treatment system is currently being checked.

Troll C production has been temporarily stopped pending the investigation results.

An expert team has been formed to determine further action and work scope.

Troll C has a daily production of around 120,000 barrels of oil and 10.5 million cubic metres of gas. The Fram licence owns 50.000 barrels of the oil and two million cubic metres of the gas.

Statoil's ownership interests:
Troll: 30,58 prosent
Fram: 45 prosent

Categories: Europe Production

Related Stories

Solstad’s Normand Vision CSV Secures Work Through 2028

TechnipFMC Gets On Board Eni’s Baleine Phase 3 Development

Equinor Awards Over $600M in Contracts for Four Subsea Projects

Current News

DOF Group Wins Contract Award in APAC Region

Nigeria's Discovers Oil on Lease 74

Offshore Vessel Pair Ordered from Grandweld Shipyard

CY Frontier: First of Four Heavy Transport Vessels

Subscribe for OE Digital E‑News