BG awards Tanzania pre-FEED study

OE Staff
Friday, June 20, 2014

Genesis Oil & Gas consultants has been awarded an upstream concept select study by BG Group, as operator of Blocks 1, 3, and 4, offshore Tanzania.

Genesis' scope of work includes considering the upstream facilities required to develop large discoveries made in the three blocks, in 1000-1800m water depths, via an onshore liquefied natural gas (LNG) plant. 

The work will also include concept selection and pre-FEED (front-end engineering and design) activities. It will be carried out in Genesis’ London Headquarters in St Paul's.

 
Categories: LNG Deepwater Engineering Europe Natural Gas Africa

Related Stories

Eni’s Congo LNG Phase 2 Begins Exports with First LNG Cargo (Video)

Saipem’s Underwater Drone Carries Out Autonomous Survey at Njord Field

Shell Falls Short of Profit Estimates

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Two DOF Vessels Get Work in North Sea and Australia

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Subscribe for OE Digital E‑News