Pacific Drilling rescinds Zonda contract

OE Staff
Thursday, October 29, 2015

Pacific Drilling announced that it has exercised its right to rescind the construction contract for ultra-deepwater drillship Pacific Zonda due to the failure by Samsung Heavy Industries (SHI) to timely deliver a vessel that substantially meets the criteria required for completion of the vessel in accordance with the construction contract and its specifications. Pacific Drilling made advance payments totaling approximately $181.1 million under the contract, and will be seeking a refund of the installment payments.

The Pacific Zonda was to be an upgraded dual load path Samsung 12000 design dynamically-positioned, dual gradient-capable drillship meant for moderate environments and water depths up to 3657m (12,000ft) using 18¾-in BOP and 21in OD marine drilling riser.

The drillship was originally meant to be delivered in Q2 2015.

Categories: Asia Construction

Related Stories

Velesto Secures Malaysia Drilling Deal with Hibiscus

Yinson Production, PTSC Raise Over $130M for Vietnam’s Block B FSO

Oil Climbs Above $110 After Gulf Drone Attacks Raise Supply Fears

Current News

Seiche Leads Pilot Study to Assess Piling Noise Offshore

Aqua superPower, Tidal Transit Partner on Electric CTVs

Liebherr Completes Offshore Crane Overhaul on ZITON’s Jack-Up Vessel

Adura Hires Shearwater for OBN Seismic Survey Job on North Sea Field

Subscribe for OE Digital E‑News