VIDEO: Culzean installation highlights

OE Staff
Wednesday, December 6, 2017

Danish oil firm Maersk Oil has published a video with timelapse footage and interviews with key people, showing the main 2017 milestones in the UK North Sea Culzean development.

The Culzean field - discovered in 2008 - is in the UK central North Sea, about 250km east of Aberdeen in block 22/25a. Water depth is about 88m and the reservoir is about 4300m below sea level.

The overall Culzean development consists of a wellhead platform, a central processing facility platform and a separate utilities and living quarter platform. The platforms will be interconnected by two bridges, each approximately 100m in length. First gas is expected in 2019. The Culzean project has the potential to meet around 5% of the British gas consumption in 2020/21.

Watch some of the awesome footage from the 2017 installation campaign below. 

 

Categories: Engineering North Sea Europe Installation Platform Fabrication

Related Stories

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

Serica Posts 50% Profit Drop Due to Triton FPSO Downtime

Shell-Equinor JV Adura Signs $3B Financing Deal

Current News

OMV Petrom’s Black Sea Well Fails to Find Significant Gas Volumes

Eco Wave Power Completes Los Angeles Wave Energy Pilot with Shell

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

BP, ADNOC JV Takes FID on Harmattan Gas Project off Egypt

Subscribe for OE Digital E‑News