VIDEO: Culzean installation highlights

OE Staff
Wednesday, December 6, 2017

Danish oil firm Maersk Oil has published a video with timelapse footage and interviews with key people, showing the main 2017 milestones in the UK North Sea Culzean development.

The Culzean field - discovered in 2008 - is in the UK central North Sea, about 250km east of Aberdeen in block 22/25a. Water depth is about 88m and the reservoir is about 4300m below sea level.

The overall Culzean development consists of a wellhead platform, a central processing facility platform and a separate utilities and living quarter platform. The platforms will be interconnected by two bridges, each approximately 100m in length. First gas is expected in 2019. The Culzean project has the potential to meet around 5% of the British gas consumption in 2020/21.

Watch some of the awesome footage from the 2017 installation campaign below. 

 

Categories: Engineering North Sea Europe Installation Platform Fabrication

Related Stories

Fugro Gets Dogger Bank South Offshore Wind Survey Job

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Green Volt Floating Wind Farm Secures All Planning Approvals in UK

Current News

Talos Energy Makes Leadership Team Changes

SOVs – Analyzing Current, Future Demand Drivers

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Skanska Set for South Brooklyn Marine Terminal Buildout

Subscribe for OE Digital E‑News