Lukoil Groundbreaking Ceremony at Rakushechnoye Field

Laxman Pai
Wednesday, October 17, 2018

Russia's Lukoil informed its President Vagit Alekperov, jointly with Head of the Astrakhan Region Sergey Morozov, took part in the official groundbreaking ceremony to mark the start of construction of infrastructure facilities of Rakushechnoye field.

This is the Company's third large project in the Caspian Sea alongside with two other fields, Yury Korchagin and Vladimir Filanovsky.

Commercial oil production, with an estimated plateau level of 1.2 million tonnes, is expected to commence in 2023.

Proximity to the Сompany's other Caspian fields makes it possible to use already available power supply facilities and infrastructure for the treatment and shipping of the products, thus contributing to an overall optimization of the project.

The Rakushechnoye field's infrastructure includes an ice-resistant fixed offshore platform and a living-quarter platform, interconnected with a gallery bridge. All the facilities will be built by a Russian contractor at shipbuilding yards in the Astrakhan Region.

Categories: Contracts Construction and Design Engineering

Related Stories

Gazelle Secures Multi-Million Funding for Floating Wind Demo

Gazelle Secures Multi-Million Funding for Floating Wind Demo

Eni Starts Drilling Activities off Ghana with Seventh-Gen Drillship

Eni Starts Drilling Activities off Ghana with Seventh-Gen Drillship

Portuguese Firm Bags $280M for Maintenance Work on Petrobras' Platforms

Portuguese Firm Bags $280M for Maintenance Work on Petrobras' Platforms

Current News

Aker Solutions Awarded Contract for BalWin2 Offshore Wind Project

Nigeria Introduces Oil Tax Relief for Cost-Cutting Measures Implementation

Gazelle Secures Multi-Million Funding for Floating Wind Demo

OMV Exits Ghasha Gas Project off UAE with Lukoil Stake Sale

Subscribe for OE Digital E‑News

Offshore Engineer Magazine