Technip wins P-76 floater work

Technip worked on the Pazflor project offshore AngolaTechnip, leader of a 50/50 consortium with Techint, was awarded by PNBV a substantial contract for the topside construction and integration, the commissioning and start up assistance of the P-76 floating production storage and offloading (FPSO) unit.

Located in the Santos Basin pre-salt area offshore Rio de Janeiro, Brazil, this unit will produce 180,000 barrels of oil and 7 million cubic meters per day of gas.

Technip’s operating center in Rio de Janeiro will perform the project management, engineering and procurement. The 24,000-ton modules fabrication, integration and commissioning will be performed in Techint’s yard, in the South of Brazil. The project is scheduled to be completed by mid-2017.

José Jorge Araújo, Technip’s Senior Vice President Onshore Latin America and Offshore Brazil, declared: “We are delighted to have the opportunity to keep working with Petrobras.

"This contract strengthens furthermore our presence in the burgeoning Brazilian offshore pre-salt market, where our leading-edge position enables us to meet its high standards and requirements.

"We fully expect that our partnership with Techint will be a key to the success of the P-76 FPSO. Moreover, this project will contribute to the local economy as it will require approximately 70% of Brazilian local content.”

Current News

US Plans 12 Offshore Wind Auctions Over Five Years

US Plans 12 Offshore Wind Auct

Equinor Wraps Up Hammerfest LNG Leak Repair, Maintains Friday Restart

Equinor Wraps Up Hammerfest LN

Namibia Targets First Oil Production from Venus Field in 2029/2030

Namibia Targets First Oil Prod

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Second HVDC Platform Installed

Subscribe for OE Digital E‑News

Offshore Engineer Magazine