Talos spuds first Mexican exploration probe

Published

Talos Energy has started drilling the Zama-1 exploration well in Block 7 in the shallow water Sureste Basin, offshore Mexico.

The well is the first exploration well to be drilled on acreage awarded in Mexico's first international licensing round in 2015, says partner Premier Oil. 

The well's principal target is the low risk Zama prospect with supportive direct hydrocarbon indicators in the Tertiary clastic reservoirs.

The Zama structure is estimated to have a P90-P10 gross unrisked resource range of 100-500 MMbbl, says Premier says. The well is expected to take up to 90 days to drill both the Zama prospect and the secondary target, Zama Deep, at a total cost to Premier of US$16 million.

The partners in Block 7 are Talos Energy (operator, 35%), Sierra Oil and Gas (40%) and Premier (25%).

Current News

Venterra Company, CAPE Holland, Awarded Contract for Fengmiao Offshore Wind Farm

Venterra Company, CAPE Holland

Bae Systems Launches Incubator Program to Propel Technologies Beyond Defense

Bae Systems Launches Incubator

DOF Group ASA Contract Award for Well Intervention Services in North America

DOF Group ASA Contract Award f

Jacket Loadout Milestone Completed for BorWin6 Offshore HVDC Platform

Jacket Loadout Milestone Compl

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine