Hydratight, CSS diverless clamp repairs WA pipeline

Published

Engineering teams from UK-based subsea connector specialists Hydratight and Norwegian technologists Connector Subsea Solutions (CSS) have completed a milestone deepwater pipeline repair in Western Australia. 

A 4in MEG line, owned by a major national oil company (NOC), required urgent repair. It was pressure rated to 400 bar and was located at 830m, so it required a customized solution. The international team designed, manufactured and installed a diverless Structural Deepwater Pipeline Repair Clamp for the project. 

The clamp has been designed without the use of bolt tensioning to activate. All activation technologies and hydraulics are in an external installation tool, which is removed on completion. This significantly reduces the overall weight of the equipment left as a permanent repair on the pipe, lowering project time and costs.

Prior to installation of the clamp, CSS and Hydratight also prepared the pipe using a remotely operated vehicle-based Coating Removal Tool. 

After successful testing and real-life completion for a major NOC, the companies can offer similar services worldwide to increase the lifespan of subsea installations. The clamps are DNV approved and will last up to 25-years in service.

Image: diverless Structural Deepwater Pipeline Repair Clamp/Hydratight

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Precision Shaft Alignment: A S

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Aquaterra Energy Gets Multi-Ye

Two DOF Vessels Get Work in North Sea and Australia

Two DOF Vessels Get Work in No

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Seatrium Unit Launches Arbitra

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine