PFLNG Satu loads first cargo

Petronas’ first floating liquefied natural gas (LNG) facility, PFLNG Satu, has successfully loaded its first cargo at the Kanowit gas field, offshore Sarawak.

The first cargo was fully loaded onto the LNG carrier Seri Camellia which is expected to set sail for a South Asian market.

“This accomplishment effectively demonstrates Petronas’ proven technology and capability of adapting a conventionally land-based installation to a floating LNG facility, a game-changer in today’s LNG business landscape,” says Petronas President and Group CEO Datuk Wan Zulkiflee Wan Ariffin.

Manned by 145 crew onboard, PFLNG Satu is designed for water depths of between 70-200m and possesses a processing capacity of 1.2 MTPA. The facility achieved first gas last November and produced its first drop of LNG a month after. 

Image: PFLNG Satu / Petronas

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine