Production resumes at Tamar

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Current News

Equinor Granted Permission for Two Extensions in Britain

Equinor Granted Permission for

Balmoral Comtec Expands Workforce Following Rosebank Win

Balmoral Comtec Expands Workfo

ONGC Hires Consortium to Deliver FEED Work for Bay of Bengal Oil Field

ONGC Hires Consortium to Deliv

Sea Machines Launches Its First Turnkey USV

Sea Machines Launches Its Firs

Subscribe for OE Digital E‑News

Offshore Engineer Magazine