Edda Wind Orders MacGregor Gangway for Offshore Wind Vessel

Published

Credit: MacGregor
Credit: MacGregor

Deck machinery specialist MacGregor has received an order from offshore wind vessel owner Edda Wind to equip one of its vessels with a walk-to-work system.

The SOV vessel, to be delivered in the third quarter of 2024, will be equipped with MacGregor’s all-electric walk-to-work gangway Horizon.

MacGregor said the order, of an undisclosed value, was the eighth in the series of walk-to-work systems to be delivered to Edda Wind.

Edda Wind currently owns and operates three offshore wind SOVs and one CSOV and has ten offshore wind vessels under construction - one SOV
and nine CSOVs.

Current News

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Jasmund Substation’s Topside and Jacket Sets Sail to Baltic Sea

Jasmund Substation’s Topside a

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine