Indonesia Offers Six Oil and Gas Blocks for Bidding

Published

©Elnur/AdobeStock
©Elnur/AdobeStock

Indonesia is offering five exploration oil and gas working areas and one exploitation working area across the country in its first bidding round of this year, a senior energy official said on Wednesday.

The oil and gas blocks have a total potential resources of 3.94 billion barrels of oil and 14.08 trillion cubic feet of gas, energy ministry data showed.

Those offered are offshore Northwest Aceh, offshore Southwest Aceh, and Arakundo in Aceh, Bawean in offshore East Java, Bengara 1 in North Kalimantan, and Maratua 2 in offshore Makassar Strait.

Tutuka Ariadji, the ministry's director-general of oil and gas, said the government had improved the contractor's split and offers flexibility in a production sharing scheme.

It had also lowered a shareable First Tranche Petroleum (FTP) to 10% from 20% to attract more bidders.

FTP is the portion of oil or gas produced and set aside before any deduction is made for recovery of operating costs and production handling costs, which the government and the contractor are entitled to.

(Reporting by Bernadette Christina; Editing by Martin Petty)

Current News

IMCA Launches 2030 Strategy to Guide Offshore Construction Industry

IMCA Launches 2030 Strategy to

Tullow Oil Taps DeepOcean for Subsea Riser Job off Ghana

Tullow Oil Taps DeepOcean for

DNV Finds Aker BP, Höegh Evi's Offshore CO2 Injection Concept Feasible

DNV Finds Aker BP, Höegh Evi's

DEME, Prysmian Start Cable Installation for Dutch Offshore Wind Grid Links

DEME, Prysmian Start Cable Ins

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine