Prelude's first float out

Published

Watch as the 488m-long hull of Shell’s Prelude floating liquefied natural gas (FLNG) facility floats out of the dry dock at Geoje, South Korea’s Samsung Heavy Industries yard, where the facility is currently under construction. Upon completion, Prelude FLNG will be the largest-ever floating facility, and is set to produce approximately 3.6MM tonnes of liquefied natural gas (LNG) annually.

Current News

Seiche Leads Pilot Study to Assess Piling Noise Offshore

Seiche Leads Pilot Study to As

Aqua superPower, Tidal Transit Partner on Electric CTVs

Aqua superPower, Tidal Transit

Liebherr Completes Offshore Crane Overhaul on ZITON’s Jack-Up Vessel

Liebherr Completes Offshore Cr

Adura Hires Shearwater for OBN Seismic Survey Job on North Sea Field

Adura Hires Shearwater for OBN

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine