Gazprom announces first oil at Prirazlomnoye

Gazprom's Prirazlomnoye project started production in December 2013.Gazprom Neft Shelf announced the start of oil production from the Prirazlomnoye platform in the Russian Arctic.

Chief Executive Officer Alexey Miller said in a statement on December 20 that "we have become the pioneers of Russia's Arctic development."

The start of production at Prirazlomnoye had long been delayed due to challenges including aging equipment and a change in the project's shareholders structure.

The Prirazlomnoye field was discovered in 1989. It is located on the Pechora Sea shelf 60km offshore (Varandey settlement) at a water depth of 19m to 20m.

Gazprom Neft says the Prirazlomnoye field contains 72 million tons of oil reserves with a potential to achieve annual production of 6.6 million tons.

Built by Sevmash Production Association, the Prirazlomnaya offshore ice-resistant oil-producing platform is designed for well drilling, oil production, storage and offloading. The main features are its resistance to strong ice loads, long self-sustainability and year-round operability. 40 slanted wells will be drilled from it.

The Prirazlomnaya platform is designed to receive oil from other fields as well. A single platform will enable to efficiently develop adjacent fields and reduce infrastructure-associated costs.

Photo of Prirazlomnoye platform courtesy of Gazprom.

Current News

Argeo Concludes Work for TotalEnergies Offshore Namibia

Argeo Concludes Work for Total

CorPower Ocean, NTNU Join Forces for AI-Based Wave Energy Project

CorPower Ocean, NTNU Join Forc

Twelve Scottish Firms Secure Place in Offshore Renewables Supply Chain Program

Twelve Scottish Firms Secure P

Harbour Energy Gets Drilling Permit for CCS Exploration off Norway

Harbour Energy Gets Drilling P

Subscribe for OE Digital E‑News

Offshore Engineer Magazine